Solar PV and blackouts: how to keep your business running when the grid goes down

In a blackout, solar panels shut down too. With storage and backup, your business keeps running: here’s what you need.

Many business owners assume that with panels on the roof, blackouts are no longer a problem. Not so. On 23 June the heat pushed Turin’s grid to breaking point: dozens of blackouts across the city, and whole districts of Milan in the dark too. For a business, an hour without power means production lines at a standstill, cold rooms warming up, management software and servers down. And without the right battery, the system on the roof goes down with the grid.

Does solar keep working when the grid is down?

Not if it’s grid-connected. Technical standards require the inverter to shut down when grid voltage is lost, to protect engineers working on the lines. The panels keep producing, but the energy never reaches your facility.

Solar with storage and backup: what changes for your business

Without storageStandard storageStorage with backup
During the blackoutSwitches offSwitches offPowers critical loads
During the dayNo energyNo energyPanels + battery
At night / end of shiftNo energyNo energyBattery
Components——Hybrid inverter with backup + certified changeover panel

Which loads to keep running in a blackout

You don’t need to keep the whole facility running – and it would cost too much. You decide what must never stop: servers and management software, cold rooms, compressors and pumps, emergency lighting, alarms, CCTV, doors. The battery and inverter are sized for those loads and for the hours of autonomy you need.

Backup or UPS: the difference

Solar backup isn’t a UPS. Switching from grid to battery can take up to a few dozen seconds. Machinery and PLCs that can’t tolerate even a split-second interruption still need a dedicated UPS. And backup has to be built in at the design stage: adding it later costs more.

Why storage pays even without blackouts

If the fault is on the grid, ARERA (the Italian energy regulator) provides compensation for businesses: it only applies beyond a certain duration and is capped, at up to €6,000 for medium-voltage connections. A day of lost production costs more. And the battery works every day: the energy produced at midday is used at the end of the shift, instead of being bought from the grid at the highest price in Europe.

How we help

We analyse your facility’s consumption, agree the critical loads with you and size the system, storage and backup around them. We work on industrial buildings across Northern Italy and Tuscany, including tricky roofs. After installation, with the Praesidium Partner Program, we monitor the system remotely and send engineers on site when needed. To cut the cost of the investment, take a look at the incentives available to businesses.

Want to know how long you could keep running in a blackout?

It all starts with your facility’s consumption.

Free roof assessment
Free roof assessment